Risk Assessment

Author(s): 
Fredy Henriquez
Category: 
Geotechnical
 
Author(s): 
William Joughin
Category: 
Mining

Purpose of Risk Based Design

  • Cater for the inherent variability in rock mass conditions
  • To address uncertainty
  • To apply engineering judgement
  • To enable decisions to made based on the level of risk to the operation
  • Risk =
Author(s): 
Alison Hendry, Claire Linklater, Russell Staines and John Chapman
Category: 
Geochemistry

Using drillhole assay data to assess the risk of acid and metalliferous drainage (AMD) early in the planning of a mining operation can have a number of benefits.  These include:

  • Early identification of operational and closure AMD risks;
  • Optimisation of geochemical
Subscribe to RSS - Risk Assessment
SRK Turkey